WES completed the Richmond Park WTP and the YMCA CTF for the Town of Halifax.

The Richmond Park Water Treatment Plant included the completion of process piping and valve replacements and modifications. New chemical storage tanks and chem feed system were installed along with a new Main Control Panel for an automated plant operation. Variable Frequency Drives for the existing Well Pumps were installed, along with new Generator, Propane tanks and HVAC equipment. At the YMCA CTF site, WES installed new chemical storage tanks, a new chem feed systems and HVAC equipment.